Vaša firmaSend enquiry WhatsApp+385 99 399 8032

Bathroom strip-out and demolition

We strip out bathrooms and remove old layers in Istria, with space protection and waste removal. A clear agreement on what comes out and what stays saves time for the work that follows.

Free and non-binding · we reply to enquiries

Room after strip-out

What's included in bathroom strip-out in Istria

  • Removing bathtubs, WCs, washbasins and taps

  • Removing wall and floor tiles

  • Removing old laminate, parquet and skirting

  • Demolishing non-load-bearing partition walls

  • Protecting the space, doors and shared areas of the building

  • Sorting and disposing of waste via an authorised carrier or skip (details confirmed before work starts)

How we carry out strip-out in Istria

  1. 1

    Enquiry with description and photos (what is to be removed, area, floor, lift)

  2. 2

    Inspection or estimate; checking what is load-bearing and what is not

  3. 3

    Agreement on scope and schedule, written offer

  4. 4

    Protecting the space, strip-out and demolition, then waste removal

  5. 5

    Cleaning up coarse dust and handing the space over for the next trades

What affects the price of strip-out in Istria

  • What is removed and how much (m², number of items)
  • Thickness and type of layers (adhesive, screed, concrete)
  • Floor, lift and the route for carrying out waste
  • Amount and type of waste and how it is removed
  • Protection of shared areas in the building
  • Working hours and noise rules in the building

We do not publish prices: every job is different, and a price can only be given after reviewing a description, photos or the site.

Common questions about strip-out in Istria

Do you also demolish load-bearing walls?

No. Load-bearing walls and structure are not touched without a designer and structural engineer. Strip-out covers non-load-bearing partitions, linings, tiles and fixtures.

What if asbestos is suspected in an old building?

If materials that may contain asbestos turn up, work is stopped and an authorised contractor for such work is required.

Should neighbours or the building manager be told?

It is advisable and often required by house rules: strip-out creates noise and dust. Working times are best agreed in advance.

Can strip-out be completely dust-free?

Protective film and corridors reduce how far dust spreads, but a fully “dust-free” promise is not realistic for this kind of work. We agree in advance which rooms must stay passable.

Can strip-out be combined with new tiling?

Yes. After strip-out, new tiling naturally follows, and often skim coating of adjoining walls. Put both in the same enquiry so we can align one sequence of work.

Related services

Tiling and ceramics · Wall and ceiling skim coating

Send an enquiry for work in Istria

A short description, the job location and a few photos are enough for an estimate and a written offer.

Send enquiry

Planning a renovation in Istria?

Send a short description and photos – we get back with an estimate.

Send enquiry